NIS Projects
Global Hawk Dock 2
Beale Air Force Base, CA
Provided and installed all horizontal cabling for all new telephone and communications work area outlets. The cabling system consisted of Category 6 cable for both telephone and communication outlets. Also installed all of the backbone cabling to tie into existing infrastructure, the backbone included (1) 100 pair Copper Category 3 Cable, and (1) 24 strand Hybrid Fiber Optic Cable.

